1. send feedback to: [email protected]
2. Revision A
3. Stage 0
4. Stage 1
4.1. 1.1 START UP
4.1.1. Client brief
4.1.1.1. Can take multiple formats such as an email, document, PDF, existing or bid proposal, etc
4.1.1.2. Examples
4.1.2. Site data
4.1.2.1. R | QMS | Templates | Project | Site data and surveys tracker
4.1.2.2. Initial site visit
4.1.2.2.1. Checklist
4.1.2.2.2. Site visit report
4.1.2.2.3. Book PPE (personal protective equipment)
4.1.2.2.4. CSCS card (construction skills certification scheme)
4.1.2.2.5. Risk assessment
4.1.3. Client guidelines
4.1.3.1. Example
4.1.4. Employer's requirements (ERs)
4.1.4.1. Examples
4.1.5. Planning policy review
4.1.6. Other existing information
4.2. 1.2 MANAGEMENT
4.2.1. Brief
4.2.1.1. Initial client meeting agenda
4.2.1.1.1. R | QMS | Templates | Project | Agenda for initial design team meeting
4.2.1.2. Programme
4.2.1.3. Budget
4.2.1.4. Procurement route
4.2.1.5. BIM requirements
4.2.2. Project
4.2.2.1. Information management
4.2.2.1.1. Template
4.2.2.1.2. Plan list of deliverables
4.2.2.1.3. File naming guidance
4.2.2.2. Designer's responsibility matrix
4.2.2.2.1. Template
4.2.2.2.2. Example
4.2.2.2.3. Other consultants required
4.2.2.3. Design issues and decision tracker
4.2.2.3.1. Template
4.2.2.3.2. Examples
4.2.2.4. Client queries tracker
4.2.2.4.1. Example
4.2.2.5. Project risk register
4.2.2.5.1. Example
4.2.2.6. Programme
4.2.2.6.1. Internal design programme
4.2.2.6.2. Project programme
4.2.2.7. Site and surveys
4.2.2.7.1. Site data tracker example
4.2.2.7.2. Surveys checklist example
4.2.2.8. Planning
4.2.2.8.1. Validation requirements tracker
4.2.2.8.2. Planning performance agreement
4.2.2.8.3. Planning issues tracker
4.2.2.9. BIM
4.2.2.9.1. BIM quality plan
4.2.2.9.2. Guidance
4.2.2.10. Health & safety
4.2.2.10.1. CDM letter
4.2.2.10.2. Designer duties
4.2.2.10.3. Design risk strategy
4.2.3. Commercial
4.2.3.1. Legal
4.2.3.1.1. Check appointment
4.2.3.2. Financial
4.2.3.2.1. Billing schedule
4.2.3.3. Resourcing
4.2.3.3.1. Review union square
4.2.4. Quality control
4.2.4.1. Request job number
4.2.4.1.1. R | QMS | Templates | Project | Project number request and risk form
4.2.4.2. Project quality plan (PQP)
4.2.4.2.1. http://intranet/posts/16331
4.2.4.3. Design sketchbook
4.2.4.3.1. Booklet example
4.2.4.3.2. Booklet example (Landscape)
4.2.4.3.3. OneNote example
4.2.4.4. Internal team
4.2.4.4.1. Place
4.2.4.4.2. Landscape
4.2.4.4.3. Sustainability
4.2.4.4.4. Detail
4.2.4.4.5. BIM
4.2.4.5. 2i review
4.2.4.5.1. Process
4.2.4.5.2. Example
4.3. 1.3 COORDINATION
4.4. 1.4 ENGAGEMENT
4.4.1. Planning
4.4.1.1. Residential pre app report examples
4.4.2. Community & stakeholders
4.4.2.1. Consultation strategy example
4.4.2.2. Residents consultation example
4.4.2.3. Stakeholder consultation example
4.4.2.4. Community consultation example
4.4.2.5. Landscape public consultation example
4.4.2.6. Consultation feedback form example
4.4.3. Statutory authorities
4.4.3.1. Utilities
4.5. 1.5 DELIVERABLES
4.5.1. Stage report
4.5.1.1. Residential examples
4.5.1.2. Education example
4.5.2. Base line analysis
4.5.3. Layouts for costing
4.5.4. Schedule of accommodation
4.6. 1.6 CLOSE OUT
4.6.1. End of stage letter
4.6.1.1. Template
4.6.2. Invite feedback *coming soon*
4.6.3. Complete PQP
4.6.3.1. http://intranet/posts/16331
4.6.4. Lessons learned procedure *coming soon*
4.6.5. Archive information
5. Stage 2
5.1. 2.1 START UP
5.1.1. Stage 1 design report
5.1.2. Client brief
5.1.2.1. Can take multiple formats such as an email, document, PDF, existing or bid proposal, etc
5.1.2.2. Examples
5.1.3. Site data
5.1.3.1. R | QMS | Templates | Project | Site data and surveys tracker
5.1.3.2. Initial site visit
5.1.3.2.1. Checklist
5.1.3.2.2. Site visit report
5.1.3.2.3. Book PPE (personal protective equipment)
5.1.3.2.4. CSCS card (construction skills certification scheme)
5.1.3.2.5. Risk assessment
5.1.4. Client guidelines
5.1.4.1. Example
5.1.5. Planning policy review
5.1.6. Employer's requirements (ERs)
5.1.6.1. Examples
5.1.7. Other existing information
5.2. 2.2 MANAGEMENT
5.2.1. Brief
5.2.1.1. Initial client meeting agenda
5.2.1.1.1. R | QMS | Templates | Project | Agenda for initial design team meeting
5.2.1.2. Programme
5.2.1.3. Budget
5.2.1.4. Procurement route
5.2.1.5. BIM requirements
5.2.1.6. Building safety act requirements *(more info soon)*
5.2.2. Project
5.2.2.1. Information management
5.2.2.1.1. Template
5.2.2.1.2. Plan list of deliverables
5.2.2.1.3. File naming guidance
5.2.2.2. Design issues and decision tracker
5.2.2.2.1. Template
5.2.2.2.2. Examples
5.2.2.3. Designer's responsibility matrix
5.2.2.3.1. Template
5.2.2.3.2. Example
5.2.2.4. Client queries tracker
5.2.2.4.1. Example
5.2.2.5. Project risk register
5.2.2.5.1. Example
5.2.2.6. Programme
5.2.2.6.1. Internal design programme
5.2.2.6.2. Project programme
5.2.2.7. Site and surveys
5.2.2.7.1. Site data tracker example
5.2.2.7.2. Surveys checklist example
5.2.2.8. Planning
5.2.2.8.1. Validation requirements tracker
5.2.2.8.2. Planning performance agreement
5.2.2.8.3. Planning issues tracker
5.2.2.9. Other consultants
5.2.2.9.1. R | QMS | Methods | Project | Advice on selection of other consultants
5.2.2.9.2. R | Quality Working Group | Subconsultants SCOPES
5.2.2.10. BIM
5.2.2.10.1. BIM quality plan
5.2.2.10.2. Guidance
5.2.2.11. Health & safety
5.2.2.11.1. CDM letter
5.2.2.11.2. Designer duties
5.2.2.11.3. Design risk strategy
5.2.3. Commercial
5.2.3.1. Legal
5.2.3.1.1. Check appointment
5.2.3.2. Financial
5.2.3.2.1. Billing schedule
5.2.3.3. Resourcing
5.2.3.3.1. Review union square
5.2.4. Quality control
5.2.4.1. Request job number
5.2.4.1.1. R | QMS | Templates | Project | Project number request and risk form
5.2.4.2. Project quality plan (PQP)
5.2.4.2.1. http://intranet/posts/16331
5.2.4.3. Design sketchbook
5.2.4.3.1. Booklet example
5.2.4.3.2. Booklet example (Landscape)
5.2.4.3.3. OneNote example
5.2.4.3.4. Precedents folder example
5.2.4.4. Input from internal team
5.2.4.4.1. Place
5.2.4.4.2. Landscape
5.2.4.4.3. Sustainability
5.2.4.4.4. BIM
5.2.4.5. 2i review
5.2.4.5.1. Process
5.2.4.5.2. Example
5.3. 2.3 COORDINATION
5.4. 2.4 ENGAGEMENT
5.4.1. Planning
5.4.1.1. Residential pre app report examples
5.4.2. Community & stakeholders
5.4.2.1. Consultation strategy example
5.4.2.2. Residents consultation example
5.4.2.3. Stakeholder consultation example
5.4.2.4. Community consultation example
5.4.2.5. Landscape public consultation example
5.4.2.6. Consultation feedback form example
5.4.3. Statutory authorities
5.4.3.1. Utilities
5.4.3.2. Fire consultant
5.4.3.3. Building control
5.4.3.4. Building insurers
5.5. 2.5 DELIVERABLES
5.5.1. End of stage report
5.5.1.1. Template *coming soon*
5.5.1.2. Residential
5.5.1.3. Extra care
5.5.1.4. Education
5.6. 2.6 CLOSE OUT
5.6.1. End of stage letter
5.6.1.1. Template
5.6.2. Invite feedback *coming soon*
5.6.3. Complete PQP
5.6.3.1. http://intranet/posts/16331
5.6.4. Lessons learned procedure *coming soon*
5.6.5. Archive information
6. Stage 3
6.1. 3.1 START UP
6.1.1. Stage 2 design report
6.1.2. Site data
6.1.2.1. R | QMS | Templates | Project | Site data and surveys tracker
6.1.2.2. Site visit
6.1.2.2.1. Checklist
6.1.2.2.2. Site visit report
6.1.2.2.3. Book PPE (personal protective equipment)
6.1.2.2.4. CSCS card (construction skills certification scheme)
6.1.2.2.5. Risk assessment
6.1.3. Client brief
6.1.3.1. Can take multiple formats such as an email, document, PDF, existing or bid proposal, etc
6.1.3.2. Examples
6.1.4. Client guidelines
6.1.4.1. Example
6.1.5. Employer's requirements (ERs)
6.1.5.1. Examples
6.1.6. Planning policy review
6.1.7. Other existing information
6.2. 3.2 MANAGEMENT
6.2.1. Brief
6.2.1.1. Initial client meeting agenda
6.2.1.1.1. R | QMS | Templates | Project | Agenda for initial design team meeting
6.2.1.2. Employer's requirements (ERs)
6.2.1.2.1. Examples
6.2.1.3. Programme
6.2.1.4. Budget
6.2.1.5. Procurement route
6.2.1.6. Building safety act requirements *(more info soon)*
6.2.1.7. BIM requirements
6.2.2. Project
6.2.2.1. Initial design team meeting
6.2.2.1.1. R | QMS | Templates | Project | Agenda for initial design team meeting
6.2.2.2. Information management
6.2.2.2.1. Template
6.2.2.2.2. Plan list of deliverables
6.2.2.2.3. File naming guidance
6.2.2.3. Designer's responsibility matrix
6.2.2.3.1. Template
6.2.2.3.2. Example
6.2.2.4. Design issues and decision tracker
6.2.2.4.1. Template
6.2.2.4.2. Examples
6.2.2.5. Client queries tracker
6.2.2.5.1. Example
6.2.2.6. Project risk register
6.2.2.6.1. Example
6.2.2.7. Programme
6.2.2.7.1. Internal design programme
6.2.2.7.2. Project programme
6.2.2.8. Site and surveys
6.2.2.8.1. Site data tracker example
6.2.2.8.2. Surveys checklist example
6.2.2.9. Planning
6.2.2.9.1. Validation requirements tracker
6.2.2.9.2. Planning performance agreement
6.2.2.9.3. Planning issues tracker
6.2.2.10. BIM
6.2.2.10.1. BIM quality plan
6.2.2.10.2. Guidance
6.2.2.11. Health & safety
6.2.2.11.1. CDM letter
6.2.2.11.2. Designer duties
6.2.2.11.3. Design risk strategy
6.2.3. Commercial
6.2.3.1. Legal
6.2.3.1.1. Check appointment
6.2.3.2. Financial
6.2.3.2.1. Billing schedule
6.2.3.3. Resourcing
6.2.3.3.1. Review union square resourcing
6.2.4. Quality control
6.2.4.1. Request job number
6.2.4.1.1. R | QMS | Templates | Project | Project number request and risk form
6.2.4.2. Review PQP
6.2.4.2.1. http://intranet/posts/16331
6.2.4.3. Design sketchbook
6.2.4.3.1. Booklet example
6.2.4.3.2. Booklet example (Landscape)
6.2.4.3.3. OneNote example
6.2.4.3.4. Precedents folder example
6.2.4.4. Internal team
6.2.4.4.1. Place
6.2.4.4.2. Landscape
6.2.4.4.3. Detail
6.2.4.4.4. Sustainability
6.2.4.4.5. BIM
6.2.4.5. 2i review
6.2.4.5.1. Process
6.2.4.5.2. Example
6.3. 3.3 COORDINATION
6.3.1. Workshops
6.3.1.1. The coordination process will typically rely on the exchange and review of information between consultants, together with workshops set up to discuss issues
6.3.2. Sending & receiving information to third parties
6.3.2.1. Send
6.3.2.2. Receive *coming soon*
6.4. 3.4 ENGAGEMENT
6.4.1. Planning
6.4.1.1. Residential pre app report examples
6.4.2. Community & stakeholders
6.4.2.1. Consultation strategy example
6.4.2.2. Residents consultation example
6.4.2.3. Stakeholder consultation example
6.4.2.4. Community consultation example
6.4.2.5. Landscape public consultation example
6.4.2.6. Consultation feedback form example
6.4.3. Statutory authorities
6.4.3.1. Utilities
6.4.3.2. Fire consultant
6.4.3.3. Building control
6.4.3.4. Building insurers
6.5. 3.5 DELIVERABLES
6.5.1. 01 Existing drawings
6.5.1.1. Site plan - example 1
6.5.1.2. Site plan - example 2
6.5.1.3. Site section
6.5.2. 02 GA plans
6.5.2.1. Site location - example 1
6.5.2.2. Site location - example 2
6.5.2.3. 1/500 plan
6.5.2.4. 1/100 plan
6.5.3. 03 Elevations
6.5.4. 04 Sections
6.5.4.1. 1/200 example
6.5.4.2. 1/100 example
6.5.5. 05 Bay studies
6.5.5.1. Example 1
6.5.5.2. Example 2
6.5.6. 06 Strategies
6.5.6.1. Cycle
6.5.6.2. Refuse
6.5.6.3. Fire
6.5.6.4. CDM *coming soon*
6.5.7. 07 Schedules
6.5.7.1. Accommodation example 1
6.5.7.2. Accommodation example 2
6.5.8. 08 Design & access statement
6.5.8.1. Guidance
6.5.8.2. Full planning
6.5.8.3. Hybrid
6.5.8.4. Infill
6.5.8.5. Outline
6.6. 3.6 CLOSE OUT
6.6.1. End of stage letter
6.6.1.1. Template
6.6.2. Invite feedback *coming soon*
6.6.3. Complete PQP
6.6.3.1. http://intranet/posts/16331
6.6.4. Lessons learned procedure *coming soon*
6.6.5. Archive information
7. Stage 3+
7.1. 3.7 DELIVERABLES
7.1.1. 01 GA plans
7.1.1.1. 1/100 example 1
7.1.1.2. 1/100 example 2
7.1.2. 02 Elevations
7.1.3. 03 Sections
7.1.4. 04 Bay studies
7.1.4.1. Example 1
7.1.4.2. Example 2
7.1.5. 05 Typologies
7.1.5.1. Windows
7.1.5.2. Doors
7.1.5.3. Walls - internal
7.1.5.4. Walls - external
7.1.5.5. Floors - ground
7.1.5.6. Floors - internal
7.1.5.7. Roofs
7.1.6. 06 Cores
7.1.6.1. Plans
7.1.6.2. Section
7.1.7. 07 Typical layouts
7.1.7.1. Bathrooms
7.1.7.2. Flat types
7.1.7.3. Kitchens
7.1.8. 08 Details
7.1.8.1. Balconies
7.1.8.1.1. Plan
7.1.8.1.2. Section
7.1.8.2. External walls
7.1.8.3. Ground floors
7.1.8.4. Roof parapets
7.1.8.5. Windows
7.1.8.5.1. Example 1
7.1.8.5.2. Example 2
7.1.9. 09 Strategies
7.1.9.1. Access & security
7.1.9.2. Cycle
7.1.9.3. Drainage
7.1.9.4. Fire
7.1.9.5. Floor finishes
7.1.9.6. Refuse
7.1.9.7. Signage
7.1.9.8. Window cleaning
7.1.9.9. CDM *coming soon*
7.1.10. 10 Schedules
7.1.10.1. Accommodation
7.1.10.2. Doors
7.1.10.3. Windows
7.1.11. 11 Specification - outline
7.1.12. Landscape *coming soon*
8. Stage 4
8.1. 4.1 START UP
8.1.1. Handover
8.1.1.1. Design issues and decision tracker
8.1.1.1.1. R | QMS | Templates | Project | Design issues and decision tracker
8.1.1.2. Checklist
8.1.1.2.1. R | QMS | Templates | Project | Handover checklist
8.1.2. Existing information
8.1.2.1. Project quality project (PQP)
8.1.2.1.1. http://intranet/posts/16331
8.1.2.2. BIM quality plan
8.1.2.3. Derogation schedule
8.1.2.3.1. Template
8.1.2.3.2. Example #1
8.1.2.3.3. Example #2
8.1.2.4. Planning drawings
8.1.2.5. Planning conditions
8.1.2.6. Employer's requirements
8.1.2.7. Contractor's proposals
8.1.2.8. Tender drawings and specifications
8.1.2.9. Reports
8.1.2.9.1. Fire
8.1.2.9.2. Energy
8.1.2.10. Secure by design minutes
8.1.2.11. Employer's information requirements
8.1.2.12. BIM execution plan
8.1.2.13. Revit model
8.2. 4.2 MANAGEMENT
8.2.1. Brief
8.2.2. Project
8.2.2.1. Initial design team meeting
8.2.2.1.1. Template
8.2.2.2. Information management
8.2.2.2.1. Template
8.2.2.2.2. Plan list of deliverables
8.2.2.2.3. File naming guidance
8.2.2.2.4. Scope, activities and deliverables
8.2.2.3. Derogation schedule
8.2.2.4. Scope and designer's responsibility matrix
8.2.2.4.1. Example
8.2.2.5. Project risk register
8.2.2.5.1. Example
8.2.2.6. Programme
8.2.2.6.1. Contractor's information release schedule
8.2.2.6.2. Typical programme example
8.2.2.7. Site visits
8.2.2.7.1. Site visit report
8.2.2.7.2. Book PPE (personal protective equipment)
8.2.2.7.3. CSCS card (construction skills certification scheme)
8.2.2.7.4. Risk assessment
8.2.2.8. Building systems checklist
8.2.2.8.1. Template
8.2.2.8.2. Example
8.2.2.9. Materials combustibility list
8.2.2.9.1. Template
8.2.2.9.2. Example
8.2.2.10. Value engineering (VE)
8.2.2.10.1. Example
8.2.2.11. Change control
8.2.2.11.1. Template
8.2.2.11.2. Example
8.2.2.12. Planning conditions tracker
8.2.2.12.1. Template *coming soon*
8.2.2.12.2. Example
8.2.2.13. Health & safety
8.2.2.13.1. CDM letter
8.2.2.13.2. Designer duties
8.2.2.13.3. Design risk strategy
8.2.2.13.4. Warranty providers
8.2.2.14. BIM
8.2.2.14.1. BIM quality plan
8.2.2.14.2. Guidance
8.2.3. Commercial
8.2.3.1. Legal
8.2.3.1.1. Check appointment
8.2.3.2. Financial
8.2.3.2.1. Billing schedule
8.2.3.3. Resourcing
8.2.3.3.1. Review union square
8.2.4. Quality control
8.2.4.1. Request job number
8.2.4.1.1. R | QMS | Templates | Project | Project number request and risk form
8.2.4.2. Project quality project (PQP)
8.2.4.2.1. http://intranet/posts/16331
8.2.4.3. 2i review
8.2.4.3.1. Process
8.2.4.3.2. Example
8.2.4.4. Compliance review
8.2.4.4.1. Flat compliance
8.2.4.4.2. Building regulations checklist *coming soon*
8.3. 4.3 COORDINATION
8.3.1. Workshops
8.3.1.1. The coordination process will typically rely on the exchange and review of information between consultants, together with workshops set up to discuss issues
8.3.2. Mechanical electrical and plumbing (MEP)
8.3.2.1. Sketch example
8.3.2.2. Email thread example
8.3.3. Structural engineer (SE)
8.3.3.1. Sketch example
8.3.4. Sending & receiving information to third parties
8.3.4.1. Send
8.3.4.2. Receive *coming soon*
8.3.5. Other
8.3.5.1. Acoustics
8.3.5.2. Thermal example
8.3.5.3. Fire
8.4. 4.4 ENGAGEMENT
8.4.1. Building control
8.4.1.1. Typically the contractor will be responsible for the building control application
8.4.1.2. As lead designer, we may need to engage with the building control officer or approved inspector
8.4.1.3. BSA - check duties - tony
8.4.2. Secure by design
8.4.2.1. Typically the contractor will be responsible for the SbD application
8.4.2.2. As lead designer, we may need to engage with the SbD officer
8.4.3. SAP assessor
8.4.3.1. Advise client the need to engage with SAP assessor during stage 4
8.4.4. Planning
8.4.4.1. Engage with the planning officer regarding planning conditions and amendments
8.4.5. Residents
8.4.5.1. We may need to engage with residents to communicate changes to design
8.4.6. Facilities management
8.4.6.1. We may need to engage with the client's facilities management with building maintenance queries
8.4.7. Principal designer
8.4.7.1. We will need to supply the PD with requested heath and safety information
8.4.8. BIM
8.4.8.1. We may need to engage with the client's BIM manager to discuss BIM deliverables
8.5. 4.5 DELIVERABLES
8.5.1. 01 Site Plans
8.5.2. 02-3 GA Plans
8.5.2.1. 02 GA plans 1/200
8.5.2.2. 03 GA plans 1/50
8.5.3. 04 GA Elevations
8.5.3.1. Elevations 1/100
8.5.3.2. Elevations 1/20
8.5.4. 05 GA Sections
8.5.4.1. GA sections 1/100
8.5.4.2. GA sections 1/50
8.5.4.3. External Wall Sections 1/25
8.5.5. 06 Strategies
8.5.5.1. Access & security
8.5.5.2. Cycle
8.5.5.3. Drainage
8.5.5.3.1. Examples
8.5.5.3.2. Example - Roof
8.5.5.4. Fire
8.5.5.4.1. Plan examples
8.5.5.4.2. Elevation example
8.5.5.5. Refuse
8.5.5.6. Signage
8.5.5.7. CDM *coming soon*
8.5.5.8. Ventilation & overheating
8.5.5.9. Window cleaning
8.5.6. 07 Typologies
8.5.6.1. Walls - external
8.5.6.2. Walls - internal
8.5.6.3. Walls - party
8.5.6.4. Walls - linings
8.5.6.5. Floors - ground
8.5.6.6. Floors - balconies & terraces
8.5.6.7. Floors - internal
8.5.6.8. Roofs
8.5.6.9. Ceilings
8.5.6.10. Curtain Wall
8.5.6.11. External doors
8.5.6.12. Internal doors
8.5.7. 08 Schedules
8.5.7.1. Accommodation
8.5.7.2. External doors
8.5.7.3. Internal doors
8.5.7.4. Window
8.5.7.5. Ironmongery
8.5.7.6. Louvres
8.5.8. 09 RCPs
8.5.9. 10 Flat types
8.5.10. 11 Cores
8.5.10.1. Plans
8.5.10.2. Elevations
8.5.10.3. Stairs
8.5.10.4. Externals
8.5.11. 12 Kitchens & bathrooms
8.5.11.1. Bathroom M4(2)
8.5.11.2. Bathroom M4(3)
8.5.11.3. Kitchen M4(2)
8.5.11.4. Kitchen M4(3)
8.5.12. 13 Details - external
8.5.12.1. Balconies
8.5.12.1.1. Concrete example - plan
8.5.12.1.2. Concrete example - section
8.5.12.1.3. Steel example 1
8.5.12.1.4. Steel example 2
8.5.12.2. Below ground
8.5.12.3. Canopy
8.5.12.3.1. Example - aluminium
8.5.12.3.2. Example - brick
8.5.12.4. Curtain wall
8.5.12.5. Doors
8.5.12.6. External walls
8.5.12.6.1. Bird & bat box
8.5.12.6.2. Brickwork example 1
8.5.12.6.3. Brickwork example 2
8.5.12.6.4. Rainscreen example
8.5.12.6.5. Services
8.5.12.6.6. Slab edges
8.5.12.7. Metalwork
8.5.12.8. Metalwork gates
8.5.12.9. Roof
8.5.12.9.1. Drainage
8.5.12.9.2. Lift shaft overrun & hatches
8.5.12.9.3. Parapet
8.5.12.9.4. SVPs
8.5.12.10. Terrace
8.5.12.10.1. Example 1
8.5.12.10.2. Example 2
8.5.12.11. Walkway
8.5.12.11.1. Plan example
8.5.12.11.2. Section example 1
8.5.12.11.3. Section example 2
8.5.12.11.4. Section example 3
8.5.12.11.5. Soffits
8.5.12.11.6. Details example 1
8.5.12.11.7. Details example 2
8.5.12.12. Windows
8.5.12.12.1. Example 1
8.5.12.12.2. Example 2
8.5.12.12.3. Example 3
8.5.13. 14 Details - internal
8.5.13.1. Drylining
8.5.13.1.1. Ancillary
8.5.13.1.2. Ancillary linings
8.5.13.1.3. Bulkheads
8.5.13.1.4. Cores
8.5.13.1.5. Dwellings
8.5.13.1.6. Dwelling linings
8.5.13.1.7. Glazed screens
8.5.13.1.8. Reception area
8.5.13.1.9. SVP boxing
8.5.13.2. Fire stopping
8.5.13.2.1. Example 1
8.5.13.2.2. Example 2
8.5.13.3. Doors
8.5.13.3.1. Communal
8.5.13.3.2. Dwellings
8.5.13.3.3. Risers & ancillary
8.5.13.3.4. Thresholds
8.5.13.4. Joinery
8.5.13.4.1. Example 1
8.5.13.4.2. Example - bathrooms
8.5.13.5. Party walls
8.5.13.5.1. Example 1
8.5.13.5.2. Example 2
8.5.13.5.3. Example 3
8.5.13.6. Service controls
8.5.13.6.1. M4(2) - Accessible & adaptable
8.5.13.6.2. M4(3) - Wheelchair
8.5.13.7. Signage
8.5.14. 15 Specification
8.5.14.1. Example
8.5.15. Landscape *coming soon*
8.6. 4.6 CLOSE OUT
8.6.1. End of stage letter
8.6.1.1. Template
8.6.2. Invite feedback *coming soon*
8.6.3. Complete PQP
8.6.3.1. http://intranet/posts/16331
8.6.4. Lessons learned procedure *coming soon*
8.6.5. Archive information
9. Stage 5
9.1. TASKS
9.1.1. Scope and activities
9.1.1.1. R | QMS | Methods | Project | Technical Design - scope activities and deliverables stage 3 to 5
9.1.2. Conveyance drawings
9.1.2.1. Example
9.1.3. Change control
9.1.3.1. Template
9.1.3.1.1. R | QMS | Templates | Project | Change control form
9.1.3.2. Example
9.1.4. Subconsultants drawings
9.1.4.1. Example
9.1.4.2. Procedure
9.1.4.2.1. All drawing comments are to be returned with this stamp to identify status and include a disclaimer
9.1.5. Site visits
9.1.5.1. Site visit report
9.1.5.1.1. R | QMS | Templates | Project | Site Visit Report
9.1.5.2. Book PPE (personal protective equipment)
9.1.5.2.1. http://intranet/posts/27023
9.1.5.3. CSCS card (construction skills certification scheme)
9.1.5.3.1. All staff visiting any site will be expected to hold a current CSCS card and/or RIBA H&S certificate
9.1.5.3.2. More info here
9.1.5.4. Risk assessment
9.1.5.4.1. Template
9.1.5.4.2. Example
9.1.6. Quality monitor role *coming soon*
9.2. CLOSE OUT
9.2.1. End of stage letter
9.2.1.1. Template
9.2.2. Invite feedback *coming soon*
9.2.3. Complete PQP
9.2.3.1. http://intranet/posts/16331
9.2.4. Lessons learned procedure *coming soon*
9.2.5. Archive information
10. Stage 6
10.1. TASKS
10.1.1. Last construction drawings
10.1.1.1. Procedure
10.1.1.2. Example
10.2. CLOSE OUT
10.2.1. End of stage letter
10.2.1.1. Template
10.2.2. Invite feedback *coming soon*
10.2.3. Complete PQP
10.2.3.1. http://intranet/posts/16331
10.2.4. Lessons learned procedure *coming soon*
10.2.5. Archive information
11. Stage 7
11.1. TASKS
11.1.1. Observational survey
11.1.1.1. Template
11.1.1.2. Example
11.1.2. Post occupancy evaluation (POE)
11.2. CLOSE OUT
11.2.1. End of stage letter
11.2.1.1. Template
11.2.2. Invite feedback *coming soon*
11.2.3. Complete PQP
11.2.3.1. http://intranet/posts/16331
11.2.4. Lessons learned procedure *coming soon*
11.2.5. Archive information
12. Resources
12.1. Architectural detail library *coming soon*
12.2. Conservation & retrofit
12.2.1. http://intranet/groups/conservation
12.2.2. *More coming soon*
12.3. Graphic resources *coming soon*
12.3.1. LB easiguides
12.3.1.1. Indesign
12.3.1.2. Word
12.3.2. *coming soon*
12.4. Precedent library *coming soon*
12.5. Technical guidance
12.5.1. LB guidance notes
12.5.2. LB easiguides
12.5.2.1. Bathrooms
12.5.2.2. Environmental design
12.5.2.3. London housing standards
12.5.2.4. Passivhaus
12.5.2.5. What makes a good home
12.5.2.6. Wheelchair
12.5.3. LB standard build ups
12.5.3.1. Walls
12.5.3.1.1. External
12.5.3.1.2. Party
12.5.3.1.3. Internal
12.5.3.1.4. Linings
12.5.3.2. Floors
12.5.3.2.1. Ground
12.5.3.2.2. Internal
12.5.3.2.3. Balconies/ terraces
12.5.3.3. Roofs
12.5.4. Building regulations
12.5.5. British standards
12.5.6. Technical publications
12.5.6.1. LB library
12.5.6.2. Online library
12.5.7. Sector specific guidance *coming soon*
12.5.8. Specifications
12.5.8.1. Office master *Paul*
12.6. Sustainability *coming soon*
12.7. Revit
12.7.1. LB standards *coming soon*
12.7.2. British standards
12.7.2.1. Standard 2D symbols
12.7.2.2. Standard family naming
12.7.2.3. Standard graphic symbols for fire protection
12.7.3. Tutorials
12.7.3.1. LB training recordings
12.7.3.2. Revit course
12.7.3.2.1. PDF index of videos
12.7.3.2.2. Videos
12.7.3.2.3. Revit step by step exercise
12.7.4. Templates
12.7.4.1. Digital protocol
12.7.5. Guidance
12.7.5.1. Start up
12.7.5.1.1. Project set up
12.7.5.1.2. Setting up shared coordinates
12.7.5.1.3. Resetting shared coordinates
12.7.5.2. Workflows
12.7.5.2.1. Urban design *coming soon*
12.7.5.2.2. Landscape *coming soon*
12.7.5.2.3. Conservation *coming soon*
12.7.5.2.4. Feasibility *coming soon*
12.7.5.2.5. Planning *coming soon*
12.7.5.2.6. Working drawings
12.7.5.3. Modelling
12.7.5.3.1. Upgrading models
12.7.5.3.2. Model maintenance
12.7.5.3.3. Troubleshooting
12.7.5.3.4. Managing Revit data through excel
12.7.5.4. Families
12.7.5.4.1. LB door families
12.7.5.4.2. Families basics
12.7.5.5. Plugins
12.7.5.6. Issuing & archiving
12.7.5.6.1. Issuing to third party
12.7.5.6.2. Archiving
12.7.5.6.3. Batch Print PDFs
12.7.5.6.4. Procedures to send models to a third party
12.7.5.7. Interoperability
12.7.5.7.1. Sketchup to Revit
12.7.5.7.2. CAD to Revit to CAD
12.7.5.8. Housing workflows
12.7.5.8.1. Scheduling accommodation
12.7.5.8.2. Drawing housing layouts
12.7.5.9. Sustainability
12.7.5.9.1. Sun settings for shading and sunlight analysis
12.7.5.10. FAQs
12.7.5.10.1. hidden elements
12.7.5.10.2. Errors & warnings
12.7.5.10.3. Keyboard shortcuts
12.8. BIM
12.8.1. British standards
12.8.2. *More coming soon*
12.9. CDM *coming soon*
12.10. Model making
12.10.1. 3D printing
12.10.1.1. Presentation
12.10.1.2. Mini guide
12.10.2. Model making room London